Answers to frequently asked questions
Frequently Asked Questions
The project is located in Neuville, Quebec, on the site of the engineered landfill operated by Récolo.
The commissioning is currently targeted for autumn 2027.
The project aims precisely to capture and treat biogas. By removing certain compounds responsible for odors, it will help reduce olfactory nuisances.
The site is designed to generate very little noise. The equipment will be installed in such a way as to limit noise impact.
Liquefaction makes it easier to transport the RNG to the Énergir injection station. The gas in liquid form occupies less volume, which reduces the number of tanker trucks on the road.
The liquefied RNG will be transported by tanker truck to the Énergir injection station. One to two trips are planned per week.